Title: Proposed Project: Related applications on a 1.11 acre site: SPECIAL DEVELOPMENT PERMIT: To demolish a vacant commercial building and construct a new 16,000-square-foot, 2-story building for a childcare and preschool facility of up to 192 children. The project includes a new eight-foot concrete masonry unit (CMU) wall along the western property line and the southwestern portion of the southern property line. Location: 855 E. Homestead Rd. (APNs: 309-51-005) File #: PLNG-2025-0206 Zoning: Office/Planned Development (O/PD) Applicant / Owner: Sarah Zagoury, CASCO of Primrose Schools / Mohit Patel, SST Investments LLC Environmental Review: Statutory Exemption under Public Resources Code Section 21080.69(a)(1) (SB 131). Project Planner: Wendy Lao, (408) 730-7408, wlao@sunnyvale.ca.gov
Attachments: 1. Vicinity and Noticing Map, 2. Recommended Findings, 3. Recommended Conditions of Approval, 4. Project Data Table, 5. Site and Architectural Plans, 6. Applicant Project Description Letter, 7. Londonderry Drive - Gate Access Narrative, 8. Local Transportation Analysis, 9. Noise Study, 10. Air Quality Report, 11. Arborist Report (See Corrected Attachment 11, posted 20261109), 12. Environmental Site Assessments & Peer Review, 13. Public Comment Letters, 14. 26-0841 Corrected Attachment 11 (posted 20261109), 15. 26-0841 Added Attachment 15 (posted 20261109), 16. DRAFT Presentation to Planning Commission RTC No 26-0841 - 20261109

REPORT TO PLANNING COMMISSION

 

SUBJECT

Title

Proposed Project: Related applications on a 1.11 acre site:

SPECIAL DEVELOPMENT PERMIT: To demolish a vacant commercial building and construct a new 16,000-square-foot, 2-story building for a childcare and preschool facility of up to 192 children. The project includes a new eight-foot concrete masonry unit (CMU) wall along the western property line and the southwestern portion of the southern property line.

Location: 855 E. Homestead Rd. (APNs: 309-51-005)

File #: PLNG-2025-0206

Zoning: Office/Planned Development (O/PD)

Applicant / Owner: Sarah Zagoury, CASCO of Primrose Schools / Mohit Patel, SST Investments LLC

Environmental Review: Statutory Exemption under Public Resources Code Section 21080.69(a)(1) (SB 131).

Project Planner: Wendy Lao, (408) 730-7408, wlao@sunnyvale.ca.gov

 

Report

REPORT IN BRIEF

General Plan: Commercial

Existing Site Conditions:                     A vacant commercial building and surface parking lot.

Surrounding Land Uses

North: Single-family residences across Londonderry Dr.

South: A shopping center, religious facility, and preschool across E. Homestead Rd. in the City of Cupertino

East: Commercial uses including a gas station and convenience store

West: Single-family residences

Staff Recommendation: Find the project is exempt under CEQA and approve the Special Development Permit with the Recommended Findings in Attachment 2 and subject to the Recommended Conditions of Approval in Attachment 3.

 

BACKGROUND

 

Description of Proposed Project

The project site is a 1.11-acre lot that is generally rectangular in shape, with a small extension along the northeastern side fronting Londonderry Drive. The proposed project would demolish the existing building and construct a new 16,000-square-foot, two-story childcare and preschool facility. The project would include outdoor play areas totaling 10,370 square feet, with shaded canopy structures along the western and northern sides of the property. The play areas would be enclosed by a six-foot-high fence. The project would also include a new eight-foot-high concrete masonry unit (CMU) wall along the western property line and the southwestern portion of the southern property line. The existing eight-foot-high sound wall along the rear property line fronting Londonderry Drive would remain. A surface parking lot with 48 parking spaces would be provided in the eastern portion of the site for staff parking and child drop-off and pick-up. Vehicular access would be provided via a driveway on East Homestead Road.

 

The facility would accommodate up to 192 children, ranging in age from birth to four years, and 27 employees, including 24 teachers and three administrative/support staff. The facility would contain 12 classrooms separated by age group. Operating hours would be 6:00 a.m. to 6:30 p.m., Monday through Friday, with occasional evening or weekend events.

 

A Special Development Permit (SDP) is required pursuant to Sunnyvale Municipal Code (SMC) Section 19.90.010 to allow a childcare center use within the O/PD zoning district and fences up to eight feet in height within the front yard setbacks. The findings required for SDP approval are discussed in the Recommended Findings in Attachment 2. See Attachment 1 for the vicinity map and mailed notice area, and Attachment 4 for the Project Data Table.

 

Previous Actions on the Site

The existing building was originally built in 1972 for agricultural purposes and was most recently used as a restaurant, which has been vacant since June 2023. Prior to development, the site was agricultural land. There are no active neighborhood preservation complaints for the project site.

 

EXISTING POLICY

General Plan Goals and Policies: The key goals and policies from the Land Use and Transportation Chapter of the General Plan which pertain to the proposed project are provided in Attachment 2.

 

Applicable Design Guidelines: The City’s Design Guidelines provide recommendations for site layout, architecture, and design. These guidelines are referenced in the discussion and analysis below.

 

ENVIRONMENTAL REVIEW

Senate Bill (SB) 131, which became effective in 2025, includes a new statutory exemption from California Environmental Quality Act (CEQA) for qualifying childcare projects that meet specific criteria established by state law. The exemption is set forth in new Section 21080.69(a)(1) of the Public Resources Code. The proposed project qualifies for this exemption because it satisfies the applicable eligibility criteria, including that it is an exclusive day care center use, is located in an office zoning district rather than residential area, and is not located within natural or protected lands.

 

DISCUSSION

Present Site Conditions

The 1.11-acre project site is located in south Sunnyvale, north of Interstate 280 and west of Wolfe Road. The site is a through-lot bounded by East Homestead Road to the south, Londonderry Drive to the north, single-family residences to the west, and commercial uses including a gas station and convenience store to the east.

 

The existing building is situated near the center of the site, toward the western portion, with surface parking areas to the east and rear. An existing driveway provides access from East Homestead Road. The existing site contains 31 existing trees, located primarily along the perimeter and within the parking areas.

 

Site Layout and Architecture

The proposed two-story building, with a height of 29 feet 8 inches, would be located toward the western portion of the project site. The building features gabled roofs, a combination of red brick veneer and white board-and-batten siding, and a limestone band. A prominent faux entryway features decorative architectural elements, including a white cupola and an ornamental weather vane, contributing to the building’s traditional, schoolhouse-inspired design.

 

The building would contain 12 classrooms, a reception area, one office on each floor, a conference room, a warming kitchen, a laundry room, and storage rooms. The outdoor play yards would include shade structures ranging in height from 10 feet 6 inches to 14 feet 6 inches.

 

The parking lot would provide 48 parking spaces, including 41 standard spaces, two compact spaces, two accessible spaces, and three van-accessible spaces. Of the 48 spaces, 18 would be equipped with electric vehicle (EV) charging stations, and 16 additional spaces would be EV-capable. One Class I and three Class II bicycle parking spaces would be provided at the northwest corner of the parking lot.

 

A trash enclosure would be located at the rear of the parking lot, and a stormwater treatment area would be located along the northeastern extension of the site. A new above-ground transformer would be installed at the front of the parking lot and screened with fencing and landscaping. The existing transformer at the rear of the site would remain and be screened by landscaping and the existing sound wall. All existing overhead utilities would be placed underground.

 

Program Operations

The facility would accommodate a maximum of 192 children, ranging in age from infants to four years old, during its regular operating hours of 6:00 a.m. to 6:30 p.m., Monday through Friday. The facility anticipates 27 employees during operating hours, for a total of up to 219 individuals on site.

 

The site will provide 48 parking spaces, with staff directed to park in more remote spaces and priority given to parents. During drop-off, parents and caregivers are expected to park in the lot, escort their children inside, and complete the digital sign-in/sign-out procedures. Drop-off hours are from 6:00 to 9:30 a.m., with peak activity between 7:30 and 8:30 a.m. Pick-up hours are from 3:30 to 6:30 p.m., with peak activity between 4:30 and 5:30 p.m. The average drop-off and pick-up visit is approximately seven minutes, and staff will monitor parking lot circulation during peak hours. A Local Transportation Analysis (LTA) was completed and concluded that the proposed parking supply is adequate to meet the peak period drop-off/pick-up demand; see Attachment 8 for more information.

 

Outdoor playground use would be limited to the hours of 10:00 a.m. to 5:00 p.m. The facility includes three playground areas, with use staggered among classrooms to accommodate different groups of children throughout the day. For example, Playground Area 1 would accommodate up to 24 infants or toddlers during each of two morning and afternoon time slots: 10:00 to 10:45 a.m. and 3:15 to 4:00 p.m. for one group, and 10:45 to 11:30 a.m. and 4:00 to 4:45 p.m. for another group. See the project description letter (Attachment 6) for additional details regarding the playground use schedule.

 

Development Standards

 

The proposed project complies with the applicable code requirements as set forth in the Sunnyvale Municipal Code (SMC), with the exception of the front setback requirements, landscape buffer requirements, and two substandard parking spaces. The following items have been identified for clarification:

 

Floor Area Ratio: The office zoning district does not have a maximum floor area ratio (FAR). The proposed FAR is 33.1%, which is allowed.

 

Setbacks: The proposed project includes a deviation from the front setback requirement. SMC Section 19.34.030 requires a 20-foot front setback, with projections of up to two feet permitted pursuant to SMC Section 19.48.070. While the main building would comply with the required setback, the entryway canopy would project five feet into the required front yard, exceeding the permitted projection by three feet. Staff supports the deviation because the canopy would provide weather protection at the entrance and enhance visual interest. Additionally, the setback is taken from the property line and due to the width of the public right-of-way, the entryway would be located approximately 36 feet 4 inches from the sidewalk, meeting the intent of the setback standard. The proposed deviation is therefore considered appropriate and could be granted through approval of the Special Development Permit.

 

Building Height: The project proposes a building height of 29 feet 8 inches as measured from the top of the closest curb (Homestead Road), which complies with the 30-foot building height limit.

 

Parking: SMC Section 19.46.100 requires a minimum of 0.25 parking spaces per student for childcare centers, resulting in a requirement of 48 parking spaces, each measuring at least 18 feet in length and 8.5 feet in width. Although the project provides the required 48 spaces, two spaces would be substandard in length at 17.23 feet to accommodate the turning radius required for solid waste vehicles. The deviation request is supportable because the two spaces would exceed the minimum length of 15 feet for traditional compact parking spaces and would maintain the required minimum width of 8.5 feet, while allowing the project to retain all 48 parking spaces.

 

Landscape buffer: The project includes a deviation from the landscape buffer requirements. SMC Section 19.37.040(b) requires a 10-foot-wide landscape buffer and an eight-foot-tall masonry wall for nonresidential uses abutting a residential zoning district, which is located west of the project site. Although the shade canopies over the play structures would be set back 10 feet from the western property line, the landscaped buffer would be reduced to five feet in width, between the masonry wall along the western property line and the playground fence to the east. The applicant indicates that the reduced buffer width is necessary to provide adequate outdoor play space, while selective landscaping is needed to ensure child safety.

 

Staff supports the deviation because the proposed masonry wall would help ensure that noise levels comply with the City’s standards, as confirmed in the Noise Report (Attachment 9), and the primary play areas would remain at least 10 feet from the western property line. In addition, new landscaping and vegetation would screen the masonry walls to the west and north, providing a park-like setting for the play area.

 

Solid Waste and Recycling Access

The project includes garbage, recycling, and food scrap service. The applicant has coordinated with Environmental Services and Public Works Department staff to determine that the internal circulation satisfies the requirements for solid waste and recycling collection vehicles serving the building.

 

Trees & Parking Lot Shading: The site currently contains 31 trees, of which 25 trees, including 10 protected trees, are proposed to be removed. The project proposes planting 24 new trees, resulting in a total of 30 trees being distributed throughout the site, supporting the project layout and site conditions. The municipal code requires at least 50% of the parking lot to be shaded, and the proposed landscaping would provide 51.1% shade coverage. The landscape plan and the project’s draft Conditions of Approval (Attachment 3) provide additional detail on planting locations and planting requirements.

 

Construction

The project would be required through a standard Condition of Approval (BP-32) to implement a Construction Management Plan (CMP) to minimize construction-related impacts on surrounding neighbors. The CMP would include, but not be limited to, compliance with the City’s construction hours, advance notification to neighbors regarding construction schedules, use of sound-reducing equipment, noise compliance contact, and routing construction traffic to and from the project site via designated truck routes, whenever feasible.

 

Fiscal Impact

No fiscal impacts to the General Fund. The project would be subject to the standard demolition and construction related permit fees and taxes, the same as for any other development project. The project would also be subject to additional fees including the traffic impact fee as noted in the Conditions of Approval.

 

Public Contact

Neighborhood Outreach Meeting

The applicant hosted a neighborhood outreach meeting on December 12, 2025, with 3 members of the public present. The attendees expressed support for the project and also raised concerns regarding landscape maintenance, paint on the existing sound wall on Londonderry Drive, requesting for a center median on Homestead Road to address east bound vehicles existing the parking lot to turn left, and requesting a reduction to the speed limit on Homestead Road.


Planning Commission Study Session

The Planning Commission reviewed the project plans at a study session on January 12, 2026. The Planning Commission requested several revisions and clarifications, including adding pedestrian access and a gate at the rear of the site along Londonderry Drive; relocating EV charging stations to the rear of the parking lot for ease of parent drop-offs; providing specifications for crash-rated fencing along the front property line; and providing additional details regarding the sign-in/sign-out process, special events, outdoor playground space, and turf requirements. The applicant has considered these comments and incorporated project changes to address a majority of the comments. An analysis explaining why gate access from Londonderry Drive through to the project site would not be feasible is provided in Attachment 7.

 

Public Noticing

Public contact was made by posting the Planning Commission meeting agenda on the City's official-notice bulletin board at City Hall and posted in the Sunnyvale Sun. In addition, the agenda and this report are available at the NOVA Workforce Services reception desk located on the first floor of City Hall at 456 W. Olive Avenue (during normal business hours), and on the City's website.

 

453 notices were sent to surrounding property owners and residents within 1,000 feet of the subject site in addition to standard noticing practices, including advertisement in the Sunnyvale Sun Newspaper, a courtesy email to interested parties that were identified since the application was submitted, and on-site posting.

 

Staff has received one public comment letter as of date of this report, expressing concerns related to traffic and parking.

 

ALTERNATIVES

1. Find the project exempt under CEQA and Approve the Special Development Permit with the Findings in Attachment 2 and subject to the Conditions of Approval in Attachment 3.

2. Find the project exempt under CEQA and Approve the Special Development Permit with modifications (Planning Commission to provide).

3. Do not make the required findings and direct staff where changes should be made.

4. Deny the project.

 

STAFF RECOMMENDATION

Recommendation

Alternative 1: Find the project exempt under CEQA and Approve the Special Development Permit with the Findings in Attachment 2 and subject to the Conditions of Approval in Attachment 3.

 

 

Levine Act

LEVINE ACT

The Levine Act (Gov. Code Section 84308) prohibits city officials from participating in certain decisions regarding licenses, permits, and other entitlements for use if the official has received a campaign contribution of more than $500 from a party, participant, or agent of a party or participant in the previous 12 months. The Levine Act is intended to prevent financial influence on decisions that affect specific, identifiable persons or participants. For more information see the Fair Political Practices Commission website: www.fppc.ca.gov/learn/pay-to-play-limits-and-prohibitions.html

 

An “X” in the checklist below indicates that the action being considered falls under a Levine Act category or exemption:

 

SUBJECT TO THE LEVINE ACT

_X_ Land development entitlements

___ Other permit, license, or entitlement for use

___ Contract or franchise

 

EXEMPT FROM THE LEVINE ACT

___ Competitively bid contract*

___ Labor or personal employment contract

___ Contract under $50,000 or non-fiscal

___ Contract between public agencies

___ General policy and legislative actions

 

* "Competitively bid" means a contract that must be awarded to the lowest responsive and responsible bidder.

 

Staff

Prepared by: Wendy Lao, Senior Planner

Reviewed by: Julia Klein, Principal Planner

Approved by: Matt VanHua, Assistant Director of Community Development

 

ATTACHMENTS

1.                     Vicinity and Noticing Map

2.                     Recommended Findings

3.                     Recommended Conditions of Approval

4.                     Project Data Table

5.                     Site and Architectural Plans

6.                     Applicant Project Description Letter

7.                     Londonderry Drive - Gate Access Narrative

8.                     Local Transportation Analysis

9.                     Noise Study

10.                     Air Quality Report

11.                     Arborist Report

12.                     Environmental Site Assessments & Peer Review

13.                     Public Comment Letters