Legislation Details

File #: 20-0952   
Type: Report to Council Status: Passed
Meeting Body: City Council
On agenda: 12/8/2020
Title: Adopt Two Resolutions Enabling the City of Sunnyvale to Submit an Application to the State of California for up to $122 million in Clean Water State Revolving Funds to Fund the City of Sunnyvale Site Preparation and Existing Plant Rehabilitation Project
Attachments: 1. Reimbursement Resolution 2020 Site Prep and Existing Plant Rehabilitation Project, 2. Authorizing Resolution 2020 Site Prep and Existing Plant Rehabilitation Project

REPORT TO COUNCIL

SUBJECT

Title

Adopt Two Resolutions Enabling the City of Sunnyvale to Submit an Application to the State of California for up to $122 million in Clean Water State Revolving Funds to Fund the City of Sunnyvale Site Preparation and Existing Plant Rehabilitation Project

 

Report

BACKGROUND

The City has embarked on the most significant single public works program in its history, the rebuild of its aged Water Pollution Control Plant (WPCP), which is responsible for the treatment of sewage from all of Sunnyvale and a small area inside the cities of Cupertino and San Jose. Named the “Sunnyvale Cleanwater Program” (Program), total cost estimates for Phases 1-3 of this program are approximately $850 million.  The WPCP Master Plan was developed as a long-term guide for replacing facilities at the WPCP. The City adopted the Master Plan on August 23, 2016 (see RTC No. 16-0663).  

 

During Phase 1 of the Program, staff identified that favorable financing was available for the Headworks and Primary Treatment Project through the State of California Clean Water State Revolving Fund (CWSRF). By securing this $127 million loan, staff reduced debt service for the City’s Wastewater Management Fund by about $47 million, compared to the default assumption of standard utility revenue bond financing.

 

Now beginning Phase 2 projects, the Program is midway through design for the Site Preparation and Existing Plant Rehabilitation Project, which will prepare the WPCP site for upcoming construction projects, construct a portion of the WPCP perimeter flood wall, and rehabilitate the existing secondary and tertiary facilities.  This project is also eligible for a CWSRF loan. To apply for this financing, Council must adopt two resolutions, which are described below.

 

EXISTING POLICY

Council Fiscal Policy 7.11 Enterprise Fund Policies, 1.1b.1 Capital improvements associated with the existing infrastructure of a utility should be primarily funded from two sources: rate revenue and debt financing.

 

Council Fiscal Policy 7.11 Enterprise Fund Policies, 1.1b.3 Local, state and federal funding sources, such as grants and contributions, should be pursued for utility -related capital improvement projects consistent with City priorities.

 

ENVIRONMENTAL REVIEW

In accordance with the California Environmental Quality Act (CEQA), the Program Environmental Impact Report (PEIR) for the Sunnyvale Water Pollution Control Plant Master Plan was prepared and adopted by Council on August 23, 2016. In addition, the City is preparing a CEQA Addendum to the PEIR for the Existing Plant Rehabilitation and Site Preparation Project that addresses changes to the project that resulted from validation after completion of the Master Plan. The Addendum will be circulated for public comment in accordance with the requirements of the “CEQA-Plus” environmental review process required by the State Water Board, and will be presented to the City Council for adoption when the Council considers approval of the loan documents related to the CWSFR loan. The present action is necessary to ensure that funding will be available for the Project when it is approved, but does not constitute final approval of the Site Preparation and Existing Plant Rehabilitation Project.

 

DISCUSSION

The State Division of Financial Assistance administers the implementation of the State Water Resources Control Board’s (State Water Board) financial assistance programs, which include loan and grant funding for construction of municipal sewage and water recycling facilities. The CWSRF Program provides low-interest loans (currently as low as 1%) for a term of 30 years for water quality improvement projects.

 

The City is currently preparing to submit a detailed Financial Application Package for the Site Preparation and Existing Plant Rehabilitation Project.  If selected, the CWSRF loan could finance:

•                     Permitting, design, and construction for Project 833150: SCWP Existing Plant Rehabilitation - Split Flow,

•                     A portion of the permitting, design, and construction for Project 833210: SCWP Secondary Treatment Improvements (Split Flow CAS - Stage 1)

•                     Some soft costs budgeted under Projects 833110: SCWP Oversight, 831470: SCWP Construction Management, and 830240: SCWP Program Management.

The total eligible cost is estimated to be approximately $106 million. For application purposes, staff is proposing to apply for a maximum of $122 million to ensure that all eligible costs are fully covered.

 

As part of the application package, the City must submit a Reimbursement Resolution and an Authorizing Resolution adopted by the City Council.

 

Reimbursement Resolution

This resolution allows for the City to request reimbursement for funds advanced for the project prior to the issuance of the revolving fund loan. This allows the project to move forward without delay, while still receiving the benefits of the low interest financing.

 

Authorizing Resolution

In order to submit the various packages of the application and complete the administrative process of obtaining funds, the City Council must authorize a designee to act on its behalf. This resolution delegates that authority to the City Manager or his designee.

 

It is also important to note that the City issued bonds for improvements to the wastewater system in 2010. As part of that issuance, future state loans were contemplated and can be issued on parity (meaning the new debt will not be senior to the old) with the City’s 2010 Wastewater Revenue Bonds.

 

FISCAL IMPACT

There is no fiscal impact from adopting these resolutions. It is anticipated that even in the current favorable rate environment, the very low rates obtained through CWSRF have the potential to save the City’s rate payers over the life of the loan when compared to a traditional public market financing. Taking this approach is the lowest cost option for financing this project. This approach will augment additional low interest financing from the U.S. Environmental Protection Agency Water Infrastructure Finance and Innovation Act (WIFIA) program that recently financed up to $220 million of Phase 2 costs.

 

PUBLIC CONTACT

Public contact was made by posting the Council agenda on the City's official-notice bulletin board outside City Hall, Sunnyvale Public Library and Department of Public Safety. In addition, the agenda and report are available at the Office of the City Clerk and on the City's website.

 

RECOMMENDATION

Recommendation

Adopt Two Resolutions Enabling the City of Sunnyvale to Submit an Application to the State of California for up to $122 million in Clean Water State Revolving Funds to Fund the Site Preparation and Existing Plant Rehabilitation.

 

Staff

Prepared by: Allison Boyer, Assistant City Engineer

Reviewed by: Jennifer Ng, Assistant Director, Public Works

Reviewed by: Chip Taylor, Director, Public Works
Reviewed by: Tim Kirby, Director, Finance

Reviewed by: Jaqui Guzmán, Deputy City Manager

Approved by: Kent Steffens, City Manager

 

ATTACHMENTS

1. Reimbursement Resolution

2. Authorizing Resolution