REPORT TO COUNCIL
SUBJECT
Title
Award of Bid No. PW21-01 to Cratus, Inc. for Lawrence Expressway Sanitary Sewer Rehabilitation - Re-Bid, Finding of CEQA Categorical Exemption, and Approve Budget Modification No. 11
Report
REPORT IN BRIEF
Approval is requested to award a construction contract in the amount of $4,119,600 to Cratus, Inc. of San Francisco for the Lawrence Expressway Sanitary Sewer Rehabilitation Project (Public Works Project No. UY-15/03-16), approve a 10% construction contingency in the amount of $411,960, and approve Budget Modification No. 11.
EXISTING POLICY
Section 1309 of the City Charter requires public works construction contracts be awarded to the lowest responsive and responsible bidder.
Pursuant to Section 2.09.040 of the Sunnyvale Municipal Code, City Council approval is required for public works contracts exceeding $100,000 in any one transaction.
Pursuant to Sunnyvale Charter Section 1305, at any meeting after the adoption of the budget, the City Council may amend or supplement the budget by motion adopted by affirmative votes of at least four members so as to authorize the transfer of unused balances appropriated for one purpose to another, or to appropriate available revenue not included in the budget.
ENVIRONMENTAL REVIEW
This project is exempt under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301(b) as it involves the repair and maintenance of existing utility systems and/or facilities involving negligible or no expansion of use.
BACKGROUND AND DISCUSSION
The Lawrence Expressway Sanitary Sewer trunk main is a critical pipe for carrying sewage from the southern and eastern portions of the City and the Rancho Rinconada area in Cupertino and San Jose to the Water Pollution Control Plant (WPCP). Based on available records, staff believes that the sewer trunk main was originally installed in 1953 with a life expectancy of approximately 50 years. It is constructed of multiple materials and gradually increases in size from 15” at Stevens Creek Boulevard to 48” at Borregas Avenue where it enters the WPCP.
Lawrence Expressway is a multi-lane major thoroughfare with heavy traffic and is controlled by the County of Santa Clara. Consequently, a permit is required from the County prior to accessing the sewer trunk main, and the heavy traffic requires extensive traffic control. Additionally, the sanitary sewer line is much larger than most sewer lines in the City and maintenance work on such large lines is best completed and most cost effective when performed by a contractor with specialized equipment. This sewer line, like the majority of sewer lines, is impacted by corrosive sewer gasses which, over time, could lead to structural defects. In 2007, a manhole rehabilitation project applied cement lining to the manholes which slowed down the deterioration of the manhole structures and extended their useful life and facilitated continued access to the sewer trunk main.
In early 2015, the City awarded a contract to WaterWorks Engineers for completion of a condition assessment and preparation of a preliminary design report for rehabilitation of the aging infrastructure (RTC No. 15-0346).
The condition assessment work was completed in 2016 and an overall risk rating for each pipeline segment was assigned on a scale of 1 to 5, with 1 being a relatively low risk and 5 being a high risk of failure. A majority of the trunk main segments have overall risk ratings of 4 or 5. Based on these results, rehabilitation of the entire line is recommended in the next 2 to 5 years. This contract will fund the “Initial Project” to address the most critical needs at this time. The Initial Project will provide additional access points to the trunk main for ongoing maintenance, complete heavy cleaning and inspection of pipe segments that could not be completed due to limited access, and repair defects that pose an imminent failure risk within the next 1 to 2 years. The scope of future phases of the project will be based on evaluation work currently underway by the Environmental Services Department but are anticipated to be significant in cost (potentially tens of millions). Future phases will also address capacity needs.
Due to their familiarity with the overall project and their satisfactory completion of the preliminary design report, in December 2016, Council awarded a contract to WaterWorks Engineers to complete design, preparation of construction bid documents and construction support services for the Initial Project (RTC No. 16-1011).
The Lawrence Expressway Sanitary Sewer Rehabilitation project was initially advertised for competitive bidding on the City’s DemandStar public procurement network and distributed to the Bay Area Builder’s Exchange on December 27, 2019. One responsive bid was received on January 29, 2020, in the amount of $6,870,094 which was more than double the engineer’s estimate of $2,645,000 and the available budget of $3,801,645. The bid was rejected by Council on April 28 (RTC No. 20-0421) to allow staff an opportunity to reevaluate the implementation of the project. Preliminary feedback from plan holders indicated the strict limitations to work on nights and weekends deterred them from bidding. Staff reviewed the project with the County of Santa Clara and negotiated adjusted permit conditions to allow some daytime working hours to elicit more bids. The engineer’s estimate was also revised to $4,600,000.
The project was re-advertised for competitive bid on the City’s DemandStar public procurement network and distributed to the Bay Area Builder’s Exchange on October 2. 24 contractors requested bid documents with three (3) sealed bids opened on October 28. The Bid Summary is contained in Attachment 1.
The lowest responsive and responsible bid was submitted by Cratus, Inc. in the amount of $4,119,600. The bid is within the revised engineer’s estimate but above the available budget. The low bid amount is a competitive price for this work given the difficult working conditions on Lawrence Expressway.
FISCAL IMPACT
This project is funded in the Wastewater Management Enterprise Fund. The project has an available budget of $3,876,360. After consideration of remaining design and construction management costs, as well as permit fees, staff is recommending Budget Modification No. 11 to appropriate $992,662 in funding from the Wastewater Fund Capital Improvement Project Reserve to fund completion of the Initial Phase. Future phases are currently unfunded and will be considered for funding through the regular budget cycle.
Budget Modification No. 11
FY 2020/21
|
|
Current |
Increase/ (Decrease) |
Revised |
|
Wastewater Management Fund |
|
|
|
|
Expenditures |
|
|
|
|
Project 829070 - Lawrence Expressway Sanitary Sewer Rehabilitation |
$3,876,360 |
$992,662 |
$4,869,022 |
|
|
|
|
|
|
Reserves |
|
|
|
|
Capital Improvement Projects Reserve |
$4,824,822 |
($992,662) |
$3,832,160 |
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City's official-notice bulletin board outside City Hall, Sunnyvale Public Library and Department of Public Safety. In addition, the agenda and report are available at the Office of the City Clerk and on the City's website.
RECOMMENDATION
Recommendation
Take the following actions:
- Make a finding of a categorical exemption from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 (b);
- Award a contract in substantially the same form as Attachment 2 to the report in the amount of $4,119,600 to Cratus, Inc.;
- Authorize the City Manager to execute the contract when all necessary conditions have been met;
- Approve a 10% construction contingency in the amount of $411,960, and
- Approve Budget Modification No. 11 in the amount of $992,662 to provide additional project funding.
Staff
Prepared by: Gregory Card, Purchasing Officer
Reviewed by: Tim Kirby, Director of Finance
Reviewed by: Ramana Chinnakotla, Director of Environmental Services
Reviewed by: Chip Taylor, Director of Public Works
Reviewed by: Jaqui Guzmán, Deputy City Manager
Approved by: Kent Steffens, City Manager