REPORT TO COUNCIL
SUBJECT
Title
Award a $3,268,600 Contract to S & H Construction, Inc. for the Plaza del Sol Phase II ReBid Project; Make a Finding of California Environmental Quality Act (CEQA) Class 1 and Class 4 Categorical Exemptions Pursuant to CEQA Guidelines Sections 15301(c) and Section 15304; Approve a 10% Construction Contingency in the Amount of $326,860; and Approve Budget Modification No. 8 in the Amount of $1,067,998 (PW27-06)
Report
REPORT IN BRIEF
Approval is requested to award a $3,268,600 contract to S & H Construction, Inc. of Fremont, CA, for the Plaza Del Sol Phase II ReBid Project, and to approve a 10% construction contingency of $326,860. Staff also recommends approval of Budget Modification No. 8 in the total amount of $1,067,998 to fund the project.
EXISTING POLICY
Pursuant to Chapter 2.09 of the Sunnyvale Municipal Code, City Council approval is required for construction contracts exceeding $250,000.
Pursuant to Sunnyvale Charter Section 1305, at any meeting after the adoption of the budget, the City Council may amend or supplement the budget by a motion adopted by affirmative votes of at least four members to authorize the transfer of unused balances appropriated for one purpose or another, or to appropriate available revenue included in the budget.
The construction of Plaza Del Sol Phase II aligns with the Council’s strategic goal outlined in the General Plan, Chapter 4, Community Character - Goal CC-12: Maximize Access to Recreation Services, Facilities, and Amenities. This is Project ID IN-17 on the Council strategic priorities workplan.
ENVIRONMENTAL REVIEW
This project is exempt under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301(c) (Class 1 categorical exemption), which applies to minor alterations to existing highways, streets, sidewalks, bicycle and pedestrian trails, and similar facilities involving negligible or no expansion of use; and Section 15304 (Class 4 categorical exemption), which applies to minor alterations in the conditions of land, water, and/or vegetation that do not involve removal of healthy, mature, scenic trees.
BACKGROUND AND DISCUSSION
Plaza del Sol was planned to be constructed in two phases. Phase I, which included construction of the basic plaza design, concrete paving, young trees, other screening, and selective decorative features, was completed in June 2004. Phase II will include enhancements to the basic plaza, including a garage roof ramp with a walkable/usable mound, new play equipment, overhead lighting, misters, an enhanced labyrinth, additional landscaping including new trees and shrubs, vegetated shade, and planters/seat walls.
In August 2019, the City executed a contract with Callander Associates Inc. to conduct public outreach and prepare a preferred conceptual plan for Plaza del Sol Phase II. From late 2019 through early 2020, the City held two community outreach meetings and conducted an online survey to gather community input. Based on community feedback, City staff input, and the goals of the City Council-approved Capital Project, staff presented a preferred conceptual design to City Council, which approved it on August 11, 2020 (RTC No. 20-0718).
On September 28, 2021, the City awarded a $373,070 design contract, with a 10% contingency of $37,307, to Callander Associates Landscape Architecture, Inc. (RTC No. 21-0853) to prepare construction documents based on the approved conceptual design for the Plaza del Sol Phase II project.
In 2023, the City began a Wi-Fi study for Lakewood Park, Corn Palace Park, and Plaza del Sol in anticipation of major renovations at these locations. On May 21, 2024, City Council approved blanket coverage Wi-Fi at Plaza del Sol (RTC No. 24-0541). As a result of this direction, the City and the design consultants renegotiated the scope of work to include Wi-Fi in the construction documents. The remaining design contingency amount ($20,757) was used to implement the Wi-Fi design and make other requested changes to the plans. There was also a minimal additional design cost for rebidding the project. Construction support services are included in the design contract. Staff requests that the design contract contingency which was previously used for the Wi-Fi design and other changes be replenished to cover potential unforeseen costs, since the project is being built on top of a parking structure and may need additional structural sub-consultant support.
After the Wi-Fi design subconsultant joined the project, staff worked with the design team, Comcast, and AT&T to identify suitable internet service and power connections. The Wi-Fi design process was lengthy because of the network’s complexity, infrastructure requirements, and coordination with the service providers.
The City previously advertised Plaza del Sol Phase II for competitive bidding and received bids in June 2026. After receiving the bids, a bid protest was submitted to contest the apparent low bidder’s and second-lowest bidder’s qualifications to perform the waterproofing installations. After reviewing the protest and the applicable solicitation requirements, the City determined that rebidding the project was appropriate to ensure a fair and competitive procurement process. All the bids from the original solicitation were subsequently rejected on September 15, 2026 (RTC No. 26-0623), and the project was readvertised for competitive bidding.
The City advertised the Plaza del Sol Phase II ReBid construction on PlanetBids on September 25, 2026. Fifty-five (55) contractors requested bid documents, and four (4) responsive bids were received. The City opened sealed bids on October 14, 2026, and received four (4) responsive bids. S & H Construction, Inc. was the lowest responsive and responsible bidder, with a base bid of $3,268,600 (Attachment 1 - Bid Summary).
FISCAL IMPACT
Project 830510 - Plaza del Sol Phase II currently has $2,479,219 in available funding from the Park Dedication Fund and $79,000 available from the Capital Projects Fund - General Fund Asset Subfund for a total of $2,558,219. An additional $1,067,998 is needed to fully fund construction and replenish the consultant design contingency.
Budget Modification No. 8 appropriates $1,067,998 from the Park Dedication Fund’s Capital Project Reserve to fully fund construction and replenish the consultant design contingency for Project 830510 - Plaza del Sol Phase II. This includes an additional appropriation of $10,000 for construction support services.
Budget Modification No. 8
FY 2026/27
|
|
Current |
Increase/ (Decrease) |
Revised |
|
Park Dedication Fund |
|
|
|
|
Expenditure |
|
|
|
|
830510 - Plaza del Sol Phase II |
$2,479,219 |
$1,067,998 |
$3,547,217 |
|
|
|
|
|
|
Reserve |
|
|
|
|
Capital Project Reserve |
$6,889,198 |
($1,067,998) |
$5,821,200 |
PUBLIC CONTACT
Public contact was made by posting the Council meeting agenda on the City's official-notice bulletin board at City Hall, at the Sunnyvale Public Library and in the Department of Public Safety Lobby. In addition, the agenda and this report are available at the City Hall reception desk located on the first floor of City Hall at 456 W. Olive Avenue (during normal business hours), and on the City's website.
RECOMMENDATION
Recommendation
Take the following actions:
- Award a contract in substantially the same form as Attachment 2 to the report the amount of $3,268,600 to S & H Construction, Inc. of Fremont, CA;
- Find the project categorically exempt from CEQA pursuant to CEQA Guidelines Sections 15301(c) (Class 1) and 15304 (Class 4);
- Approve a 10% construction contingency in the amount of $326,860;
- Approve Budget Modification No. 8 in the amount of $1,067,998, replenishing remaining design contingency amount of $20,767 and appropriating $10,000 for consultant support services; and
- Authorize the City Manager to execute the contract when all necessary conditions have been met.
Levine Act
LEVINE ACT
The Levine Act (Gov. Code Section 84308) prohibits city officials from participating in certain decisions regarding licenses, permits, and other entitlements for use if the official has received a campaign contribution of more than $500 from a party, participant, or agent of a party or participant in the previous 12 months. The Levine Act is intended to prevent financial influence on decisions that affect specific, identifiable persons or participants. For more information see the Fair Political Practices Commission website: www.fppc.ca.gov/learn/pay-to-play-limits-and-prohibitions.html
An “X” in the checklist below indicates that the action being considered falls under a Levine Act category or exemption:
SUBJECT TO THE LEVINE ACT
___ Land development entitlements
___ Other permit, license, or entitlement for use
___ Contract or franchise
EXEMPT FROM THE LEVINE ACT
_X_ Competitively bid contract*
___ Labor or personal employment contract
___ Contract under $50,000 or non-fiscal
___ Contract between public agencies
___ General policy and legislative actions
* "Competitively bid" means a contract that must be awarded to the lowest responsive and responsible bidder.
Staff
Prepared by: David Battaglia, Purchasing Officer
Reviewed by: Matthew Paulin, Director of Finance
Reviewed by: Aaron Bert, Director of Public Works
Reviewed by: Sarah Johnson-Rios, Assistant City Manager
Approved by: Tim Kirby, City Manager
ATTACHMENTS
1. Bid Summary
2. Draft General Construction Contract
3. Project Summary Sheet