Title: Proposed Project: PUBLIC COMMENTS ON THE DRAFT ENVIRONMENTAL IMPACT REPORT: for construction of a replacement groundwater extraction well at approximately 800 to 1,000 feet below the ground surface, an approximately 56,000-gallon and 24-foot-tall water storage tank, chemical storage cabinets, and associated equipment, utility and right-of-way improvements. Location: 800 Carlisle Way (APN: 309-12-013) File #: 2022-7041 Zoning: R-0/S (Low Density Residential/Single Story) Applicant & Owner: California Water Service Environmental Review: Environmental Impact Report (State Clearinghouse #2023020080) Project Planner: Mary Jeyaprakash, (408) 730-7449, mjeyaprakash@sunnyvale.ca.gov
Attachments: 1. Site and Architectural Plans dated May 12, 2025, 2. Notice of Availability - Draft Environmental Impact Report, 3. Links to the Draft Environmental Impact Report and Associated Documents, 4. Presentation to Planning Commission RTC No 25-0723 - 20250623

REPORT TO PLANNING COMMISSION

 

SUBJECT

Title

Proposed Project:

PUBLIC COMMENTS ON THE DRAFT ENVIRONMENTAL IMPACT REPORT: for construction of a replacement groundwater extraction well at approximately 800 to 1,000 feet below the ground surface, an approximately 56,000-gallon and 24-foot-tall water storage tank, chemical storage cabinets, and associated equipment, utility and right-of-way improvements.

Location: 800 Carlisle Way (APN: 309-12-013)

File #: 2022-7041

Zoning: R-0/S (Low Density Residential/Single Story)

Applicant & Owner: California Water Service

Environmental Review: Environmental Impact Report (State Clearinghouse #2023020080)

Project Planner: Mary Jeyaprakash, (408) 730-7449, mjeyaprakash@sunnyvale.ca.gov

 

DISCUSSION

A Planning Commission Study Session was held on May 27, 2025, where staff introduced the project, and shared the analysis and findings of the project Draft Environmental Impact Report (DEIR).

 

The purpose of this public hearing is to receive comments on the adequacy of the project DEIR). The public comment period of the DEIR is from May 15, 2025, to June 30, 2025 (see Site and Architectural Plans of the project in Attachment 1 and Notice of Availability of the EIR in Attachment 2).

 

After the public comment period is over, a Final EIR (FEIR) will be prepared addressing comments and answering questions received. The FEIR will be circulated for public review before it is considered in future hearings.

 

Planning Commission and City Council hearings will be conducted to make a decision on the proposed project and certify the FEIR. These hearings will likely be scheduled in late summer or early fall 2025 and will be subject to required public notification. 

 

ATTACHMENTS

1.                     Site and Architectural Plans dated May 12, 2025

2.                     Notice of Availability - Draft Environmental Impact Report

3.                     Links to the Draft Environmental Impact Report and Associated Documents