Legislative Public Meetings

File #: 16-1079   
Type: Report to Board/Commission Status: Passed
Meeting Body: Planning Commission
On agenda: 12/5/2016
Title: File #: 2013-7609 Locations: 615, 629, 689, 691 N. Mathilda Ave., 525, 535, 555 Del Rey Ave., 650 Vaqueros Ave. (APNs: 165-43-014, -023 through -029) Zoning: PPSP/IEF Proposed Project: PEERY PARK PLAN REVIEW to redevelop 8 parcels by combining the site into one 7.5-acre site and construct two new 4-story office R&D buildings with a total of 330,668 s.f. (includes 13,988 s.f. amenities area) resulting in 100% FAR, and serviced by a new 5-level parking garage. The project is located in the Peery Park Specific Plan area. Applicant / Owner: Sequoia Del Ray LLC. / Sequoia Del Ray LLC Environmental Review: The project is exempt from additional CEQA review per CEQA Guidelines section 15168(c)(2), (3) and (4). The project is within the scope of the Peery Park Specific Plan Program EIR. The environmental impacts associated with the proposed development are adequately addressed and analyzed in the Peery Park Specific Plan Program EIR and/or can be substantially mitigated with the imposition o...
Attachments: 1. Vicinity and Noticing Map, 2. Project Data Table, 3. Recommended Findings, 4. Recommended Conditions of Approval, 5. Compliance with Program EIR CEQA checklist, 6. PPSP EIR – Mitigation Monitoring and Report Program (MMRP), 7. Proposed Community Benefits Table, 8. Letter from Applicant, 9. Public Comment, 10. Proposed Site and Architectural Plans
SUBJECT
Title
File #: 2013-7609
Locations: 615, 629, 689, 691 N. Mathilda Ave., 525, 535, 555 Del Rey Ave., 650 Vaqueros Ave. (APNs: 165-43-014, -023 through -029)
Zoning: PPSP/IEF
Proposed Project: PEERY PARK PLAN REVIEW to redevelop 8 parcels by combining the site into one 7.5-acre site and construct two new 4-story office R&D buildings with a total of 330,668 s.f. (includes 13,988 s.f. amenities area) resulting in 100% FAR, and serviced by a new 5-level parking garage. The project is located in the Peery Park Specific Plan area.
Applicant / Owner: Sequoia Del Ray LLC. / Sequoia Del Ray LLC
Environmental Review: The project is exempt from additional CEQA review per CEQA Guidelines section 15168(c)(2), (3) and (4). The project is within the scope of the Peery Park Specific Plan Program EIR. The environmental impacts associated with the proposed development are adequately addressed and analyzed in the Peery Park Specific Plan Program EIR and/or can be substantially mitigated with the imposition of uniformly applied development policies and standards.
Project Planner: Shetal Divatia, (408) 730-7637, sdivatia@sunnyvale.ca.gov
Report

REPORT IN BRIEF
General Plan: Peery Park Specific Plan
Zoning: Peery Park Specific Plan
Subdistrict: Innovation Edge/Futures Sites

Existing Site Conditions: The site is comprised of eight separate parcels that are developed with several one-story buildings totaling approximately 109,305 square feet that include office R&D, light industrial uses, and a restaurant with a drive-through facility (McDonalds).

Surrounding Land Uses:
North: R&D office building in Innovation PPSP Innovation Edge/Futures Sites Zoning District.
South: R&D office building in Innovation PPSP Innovation Edge/Futures Sites across Del Rey Ave Zoning District
East: Commercial uses including restaurant, hotels in PPSP - Mixed Commercial Edge and Highway Commercial/Planned Development Zoning Districts (across Mathilda Ave)
West: Industrial Office and R&D uses i...

Click here for full text