File #: 16-0995   
Type: Report to Board/Commission Status: Passed
Meeting Body: Planning Commission
On agenda: 12/12/2016
Title: File #: 2015-7302 Location: 221 North Mathilda Avenue (APN: 165-27-010) Zoning: PPSP/IE (Peery Park Specific Plan / Innovation Edge) Proposed Project: Related application on a 4.3-acre site: PEERY PARK PLAN REVIEW PERMIT: to allow the redevelopment of a former nursery into a three-story office/R&D building and a four-level parking structure with partial sub-grade parking, resulting in 145,516 square feet of floor area (80% FAR). The project also includes the restoration and adaptive reuse of the historic house. Applicant / Owner: Spear Street Capital Environmental Review: The project does not require additional CEQA review per CEQA Guidelines Section 15168(c)(2) and (4). The project is within the scope of the Peery Park Specific Plan (PPSP) Program EIR as there are no new anticipated environmental impacts and no new mitigation measures required. Project Planner: Momoko Ishijima, (408) 730-7532, mishijima@sunnyvale.ca.gov
Attachments: 1. Vicinity and Noticing Map, 2. Project Data Table, 3. Recommended Findings, 4. Standard Requirements and Recommended Conditions of Approval, 5. Site and Architectural Plans, 6. Project Description Letter, 7. Compliance with Program EIR CEQA Checklist, 8. PPSP EIR - Mitigation Monitoring and Reporting Program (MMRP) for Project, 9. Proposed Community Benefits Program Table, 10. Link to Heritage Preservation Commission Staff Report and Attachments, 11. Arborist Report, 12. ALUC Determination, 13. Links to Draft and Final EIR and Appendices.pdf
REPORT TO PLANNING COMMISSION

SUBJECT
Title
File #: 2015-7302
Location: 221 North Mathilda Avenue (APN: 165-27-010)
Zoning: PPSP/IE (Peery Park Specific Plan / Innovation Edge)
Proposed Project: Related application on a 4.3-acre site:
PEERY PARK PLAN REVIEW PERMIT: to allow the redevelopment of a former nursery into a three-story office/R&D building and a four-level parking structure with partial sub-grade parking, resulting in 145,516 square feet of floor area (80% FAR). The project also includes the restoration and adaptive reuse of the historic house.
Applicant / Owner: Spear Street Capital
Environmental Review: The project does not require additional CEQA review per CEQA Guidelines Section 15168(c)(2) and (4). The project is within the scope of the Peery Park Specific Plan (PPSP) Program EIR as there are no new anticipated environmental impacts and no new mitigation measures required.
Project Planner: Momoko Ishijima, (408) 730-7532, mishijima@sunnyvale.ca.gov

Report
REPORT IN BRIEF
General Plan: Peery Park
Zoning: Peery Park Specific Plan
Subdistrict: Innovation Edge

Existing Site Conditions: The site contains a single family residence facing North Mathilda Avenue with the remnant of the orchard located behind and to the west of the house. There are three other structures of varying sizes and ages on the property consisting of a garage and storage structures. The site is bounded by North Mathilda Avenue to the east, West California Avenue to the south, and Sobrante Way to the west.

Surrounding Land Uses
North: Multi-tenant commercial and industrial office buildings in PPSP Innovation Edge and PPSP Mixed Industry Core Zoning Districts
South: Industrial office buildings in PPSP Innovation Edge Zoning District
East: Multi-family residential developments in R4 High Density Residential Zoning District including a 23-unit affordable housing development for disabled individuals and families (across North Mathilda Avenue)
West: Industrial office buildings in ...