File #: 20-0877   
Type: Report to Board/Commission Status: Passed
Meeting Body: Planning Commission
On agenda: 10/12/2020
Title: Proposed Project: Related applications on a 0.3-acre site: SPECIAL DEVELOPMENT PERMIT: to demolish the existing buildings and construct a new 141,333 square foot seven (7) story office building with four (4) levels of underground parking, an adjustment to the required parking. TENTATIVE PARCEL MAP: to make adjustments to the existing parcel boundary, street easement dedication and vacation and new utility and architectural easements. Location: 100 Altair Way (APN:209-07-007) File #: 2016-7438 Zoning: DSP Block 1 Applicant / Owner: Daniel Minkoff, Minkoff Group (applicant/owner) Environmental Review: No additional review required as per CEQA Guidelines 15168(c)(2) and (4) - environmental impacts of the project are addressed in the Downtown Specific Plan Program Environmental Impact Report (EIR)(State Clearinghouse #2018052020). Project Planner: Shaunn Mendrin, (408) 730-7431, smendrin@sunnyvale.ca.gov
Attachments: 1. Site, Vicinity and Public Notice Mailing Map, 2. Project Data Table, 3. Recommended Findings, 4. Recommended Conditions of Approval, 5. Proposed Site and Architectural Plans, 6. Project Description, 7. Walker & Associates Parking Study, 8. Transportation Demand Management Program, 9. H.T. Harvey & Associates Study, 10. Staff Presentation 20201012 (20-0877)
REPORT TO PLANNING COMMISSION

SUBJECT
Title
Proposed Project: Related applications on a 0.3-acre site:
SPECIAL DEVELOPMENT PERMIT: to demolish the existing buildings and construct a new 141,333 square foot seven (7) story office building with four (4) levels of underground parking, an adjustment to the required parking.
TENTATIVE PARCEL MAP: to make adjustments to the existing parcel boundary, street easement dedication and vacation and new utility and architectural easements.
Location: 100 Altair Way (APN:209-07-007)
File #: 2016-7438
Zoning: DSP Block 1
Applicant / Owner: Daniel Minkoff, Minkoff Group (applicant/owner)
Environmental Review: No additional review required as per CEQA Guidelines 15168(c)(2) and (4) - environmental impacts of the project are addressed in the Downtown Specific Plan Program Environmental Impact Report (EIR)(State Clearinghouse #2018052020).
Project Planner: Shaunn Mendrin, (408) 730-7431, smendrin@sunnyvale.ca.gov

Report
REPORT IN BRIEF
General Plan: Downtown Specific Plan (DSP)
Existing Site Conditions: Residential, Retail and Post Office
Surrounding Land Uses
North: Office and Plaza Del Sol
South: Multi-Family
East: Plaza Del Sol
West: Office

Issues: Consistency with the Downtown Specific Plan and Parking

Staff Recommendation: Make the required Findings required to approve the CEQA determination that the project is consistent with the Downtown Specific Plan's Program Environmental Impact Report and no additional environmental review is required, and approve the Special Development Permit and Tentative Parcel Map based on Findings in Attachment 3 and Recommended Conditions of Approval in Attachment 4.

BACKGROUND
See Attachment 1 for a map of the vicinity and mailing area for notices and Attachment 2 for the Data Table of the project.

Description of Proposed Project
The proposed project includes the demolition of the existing structures and the construction:

* A new seven (7) story office building with four (4) levels of u...

Click here for full text